According to Fincantieri, the construction of the new terminal kicked off on 10 March with the laying of the first stone.
The terminal, which entails an investment of approximately €350 million (about $388 million), will be able to simultaneously harbour three latest-generation and low environmental ships, including MSC’s current flagship MSC Seashore and the line’s future LNG-powered ships.
Architecture firm Arquitectonica designed the terminal that is scheduled to begin operations by the end of 2023.